Rapid Transmission Restoration: Utility Avoids Delays, High Costs & Outages
The Situation

In October 2024, a large commercial vehicle struck a steel lattice transmission tower, severely damaging two load-bearing legs, diagonal braces, gusset plates, and anchor bolts, compromising the tower’s structural integrity.
The risks:
- Tower instability from buckled legs
- Damaged connections and misalignment
- Potential clearance and conductor tension issues
The challenge:
- Full replacement would cost $1M+ and take over a year
- Permitting and logistics added delays
- Outage was not an option—rerouting power would be costly
- Immediate action was needed to prevent further failure